Invest in FRF tokens to support us

clean energy

LG to stop manufacturing solar panels, cites industry ‘uncertainties’

LG Electronics

LG Electronics said it will stop manufacturing solar panels following a decision by the company’s board of directors on Feb. 22.

A news release said the decision was due to “uncertainties in the global solar panel business” that include price competition and the rising cost of materials.

LG’s solar panel business will close by June 30, the company said. It added that support will be provided to existing customers for an undefined period of time beyond the closure date.

LG currently operates a 550 MW solar panel manufacturing facility in Huntsville, Alabama, where it produces its Neon-2 60-cell modules. The company said it would continue to produce solar panels until the second quarter to maintain inventory levels before closing the plant. The double-sided module was designed to increase cell efficiency, which the company claimed reached 21.4%.

The $28 million Huntsville solar module assembly plant was expected to create 160 jobs when it was announced in 2018. LG catered to the residential solar market, primarily.

With its departure from the solar industry, LG said it will instead focus on “growth sectors” like energy storage and energy management.

Industry uncertainties

Experts have warned since the beginning of the coronavirus pandemic that supply chain constraints and trade issues threaten ambitious solar goals in the U.S.

A report issued by Rystad Energy last October warned that solar’s supply chain disaster could hamper more than half of global utility-scale projects in 2022. And while President Biden offered some relief with a carve-out of the Section 201 tariff for bifacial solar cells, he extended Trump-era tariffs on imported solar equipment by four years earlier in February.

Before LG’s announcement, U.S. domestic solar module production had seen some positive news in recent months, however, with experts beginning to see signs of a diversifying supply chain less dependent on components from China.

In 2021, Canadian solar module manufacturer Heliene launched a new facility in Florida and announced that it would invest $21 million to expand its Minnesota manufacturing facility. In late December, Swiss-based Meyer Burger said it would locate a manufacturing facility in Goodyear, Arizona, with an initial production capacity of 400 MW by the end of 2022. And Arizona-based First Solar, Inc. broke ground on its third manufacturing facility in Ohio. The 3.3 GWDC facility is scheduled to start operations in the first half of 2023, and represents a $680 million investment. 

China still maintains outright dominance on the solar module and component market, though. A recent ULCSA report found that Chinese producers hold 83% of global capacity for polysilicon production, 96% for wafers, 79% for cells, and 70% for modules.

Renewable Energy World will continue to update this developing story.

Author

  • John Engel is the Content Director for Renewable Energy World. For the past decade, John has worked as a journalist across various mediums — print, digital, radio, and television — covering sports, news, and politics. He lives in Asheville, North Carolina with his wife, Malia.

    Have a story idea or a pitch for Renewable Energy World? Email John at john.engel@clarionevents.com.

Related posts
clean energy

New York Bight offshore wind auction advances as bids total $1.5 billion

clean energy

LG to stop manufacturing solar panels due to industry ‘uncertainties’

clean energy

New York Bight offshore wind auction enters second day with bids totaling $1.5 billion

clean energy

Hydro-Québec to buy output from 263 MW Lievre hydroelectric portfolio

Sign up for our Newsletter and
stay informed

Leave a Reply

Your email address will not be published.